currículo de ia · formação

o currículo de ia,curso a curso.

251 cursos e 29 workshops conduzidos por praticantes, cobrindo ia em engineering, produto, dados, vendas, finanças, jurídico, rh, operações, liderança e risco. 700.5 horas de contacto no total. cada curso indica o seu nível, as suas horas, as ferramentas que usa e o artefacto com que sais.

isto não é uma videoteca. os cursos são dados num ambiente de browser com prática guiada. os labs são avaliados pelo que produzes. os workshops são conduzidos ao vivo pelos praticantes que entregam o nosso trabalho de consultoria e plataformas.

251

cursos em 16 temas

700.5

horas de contacto de conteúdo lecionado

29

workshops conduzidos por praticantes, 65 sessões

53

labs avaliados. tu constróis, nós avaliamos

Teams from across the business spend six weeks turning a real problem into a working AI tool, then present it to leadership.

A company wide build competition. Small teams pick a problem from their own work, build something that solves it over six weeks, and present it at the end to a panel who decide there and then whether to adopt it. Four live sessions guide the teams, with help available in between. This is the part of the programme where training turns into something the business can actually use.

o formato

How long
6 weeks, 4 weeks, or a 48 hour hackathon
Live sessions
4 sessions, 10 hours in total
Support throughout
A weekly drop in session every week, and a named mentor for every team
Teams
Up to 12 teams of 4 to 6 people
People
Up to 60, drawn from across the business
Where
Online, with the final presentations in person where possible

quanto tempo dura

Six weeks

The recommended length. Four live sessions with two build periods in between, so teams have real time to act on the feedback from the first progress review. That correction is where most of the quality comes from.

Four weeks

The same four sessions run on a tighter calendar, with each build period shortened to a single week. It suits organisations that cannot hold people for six weeks, but teams have less time to change direction after feedback, so problems need to be scoped smaller at the kickoff.

48 hour hackathon

One continuous event across two days. Teams pick from the pre approved list only, because there is no time to define a problem from scratch. Mentors stay with the teams throughout rather than meeting them at review points, and the panel expects a working demonstration rather than a tested tool. This format is strongest at building momentum and surfacing ideas, and weakest at producing something you can put into service the following week.

o que acontece, semana a semana

o plano abaixo é a versão de seis semanas. a versão de quatro semanas corre as mesmas quatro sessões, com cada período de construção encurtado para uma semana.

  1. Week 0Kickoff3 hour session

    Teams form and choose what to work on. Each team can either take an idea from the pre approved list drawn up with sponsors before the challenge starts, or put forward an idea of its own. Ideas submitted by a team are reviewed on the day, and once approved the team is free to take either route. Whichever they pick, the problem is then cut down to something they can genuinely finish in the time available.

    no fim desta etapaAn approved problem, taken from the list or submitted by the team, and a clear description of what a good result would look like.

  2. Weeks 1 to 2Teams buildWeekly drop in session, plus a mentor

    Teams build their first version. Stennir runs a drop in session each week, and every team has a named mentor they can reach in between.

    no fim desta etapaA first version that runs, however rough it looks.

  3. Week 2First progress review2 hour session

    Each team shows what they have built so far and gets feedback. This is where the scope gets corrected, and some teams are advised to drop half of what they planned.

    no fim desta etapaA shorter and more realistic plan for the weeks that remain.

  4. Weeks 3 to 4Teams buildWeekly drop in session, plus a mentor

    Teams keep building, with the weekly sessions now focused on testing and on what the tool does when it gets something wrong.

    no fim desta etapaA set of test cases, and the first safety checks in place.

  5. Week 4Testing and safety review2 hour session

    Teams measure how well the tool works, what it costs to run, and how it handles unclear or incorrect input. A Stennir reviewer works through each tool with its team and raises the questions the panel is likely to ask.

    no fim desta etapaA tested tool, answers to the review questions, and a plan for how it would be used day to day.

  6. Weeks 5 to 6Final preparationRehearsal with your mentor, plus drop in support

    Teams finish building and gather the evidence that their tool works. Every team rehearses its presentation with its mentor and gets feedback on how to make the case clearly in five minutes.

    no fim desta etapaA rehearsed five minute demonstration and a one page summary.

  7. Week 6Final presentations3 hour session

    Each team demonstrates their tool live to a panel of sponsors and senior leaders, then answers questions. The panel scores against the criteria below.

    no fim desta etapaA decision from the panel: adopt the tool, keep working on it, or stop.

o calendário do hackathon de 48 horas

The 48 hour format keeps the same judging criteria, with one change: the weight on evidence moves towards the demonstration itself, because two days is not enough to build a proper set of test cases. Teams whose idea is worth pursuing usually then run the six week version to turn the prototype into something usable.

  1. Day 1, 09:00Kickoff1 h

    Briefing on the rules and the judging criteria, teams form, and each team picks an idea from the pre approved list.

  2. Day 1, 10:00Build7 h

    Teams build. Mentors circulate throughout rather than waiting for a scheduled review.

  3. Day 1, 17:00Checkpoint1 h

    Each team shows what actually runs. Scope gets cut here, which is the difference between finishing and not.

  4. Day 1, 18:00Optional evening sessionopcional

    The room stays open for teams that want it. Nobody is expected to stay.

  5. Day 2, 09:00Build5 h

    Teams finish the working parts and drop anything that will not be ready.

  6. Day 2, 14:00Safety check1 h

    A mentor works through each tool with its team, covering data handling and the obvious ways it could go wrong.

  7. Day 2, 15:00Final build and rehearsal2 h

    Teams stabilise the demonstration and prepare a short case for why it matters.

  8. Day 2, 17:00Demonstrations and judging2 h

    Each team demonstrates live to the panel, which scores and decides which ideas are worth taking further.

como o painel pontua cada equipa

  • 30%Business impactIs the problem real, and would solving it matter to people outside the team?
  • 25%A working toolDoes it run on real data, live in the room, rather than as a rehearsed demonstration?
  • 20%Evidence it worksAre there test cases, a measured result, and an honest account of where it gets things wrong?
  • 15%Safe and responsible useHow data is handled, what the tool refuses to do, and whether users can tell AI is involved.
  • 10%Plan for using itWho owns it next, what it costs to run, and what needs to be true before it can be used properly.

quem está numa equipa

Teams are deliberately cross functional. A team that is all engineers builds the wrong thing well, and a team with no engineer does not build anything. Each team should bring together the perspectives below, in whatever mix suits the problem it has chosen.

  • Someone technicalBuilds the tool and makes the technical decisions
  • Someone who owns the problemDefines the problem clearly and can show what solving it is worth
  • People who do the work day to dayProvide the practical knowledge and judge whether the answers are actually right
  • A manager as sponsorApproves the problem, attends the final presentations and decides what happens next

o que ganhas com isto

resultados

  • Up to twelve working tools, built on the organisation's own data and systems
  • A ranked list of those tools, with a decision recorded against each one
  • People who have now built something with AI rather than only learned about it
  • A written record of real, tested uses that later projects can build on
  • A clear picture of which teams can build on their own and which need more support

antes de começar

  • Everyone taking part has finished the AI Foundations courses
  • Each team includes at least one person at Advanced level
  • A list of pre approved ideas has been agreed with sponsors before the kickoff
  • Each team has a manager who sponsors the problem and attends the final presentations
  • Problems come from work that is already causing difficulty, not from a brainstorm

quem fornece o quê

a stennir fornece

  • Design of the challenge, facilitation on the day, and the scoring criteria
  • Help drawing up the pre approved list of ideas with your sponsors beforehand
  • Four live sessions plus a weekly drop in help session across the six weeks
  • A named mentor for every team
  • Practice environments set up with data similar to your own
  • A written report at the end covering the decisions taken and how the teams performed

tu forneces

  • A shortlist of pre approved ideas, agreed with sponsors before the challenge starts
  • Managers willing to sponsor those problems and to review any new ideas teams put forward
  • Time for participants, roughly four hours per person per week
  • Access to the data and systems the teams need, agreed before the kickoff
  • A panel for the final presentations, including someone who can approve adoption

queres uma trilha construída para a tua equipa?

diz-nos a equipa, o resultado e o calendário. voltamos com uma trilha tirada deste catálogo, as datas da coorte e o preço.